{"id":99734,"date":"2026-08-27T05:50:23","date_gmt":"2026-08-27T05:50:23","guid":{"rendered":"https:\/\/www.timberindustrynews.com\/?p=99734"},"modified":"2026-08-27T15:39:50","modified_gmt":"2026-08-27T15:39:50","slug":"brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone","status":"publish","type":"post","link":"https:\/\/www.timberindustrynews.com\/ro\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/","title":{"rendered":"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone"},"content":{"rendered":"<p>A Brazilian enforcement case involving allegedly fraudulent timber credits offers European importers a useful preview of one of the harder questions under EUDR: how to deal with wood that has entered an official traceability system but whose physical origin may not match the records accompanying it.<!--more--><\/p>\n<p>Brazil's environmental authority Ibama shut down a sawmill in Rond\u00f4nia on 13 August after concluding that the company had repeatedly breached an operating block imposed following earlier environmental violations.<\/p>\n<p>The sawmill, located in Vista Alegre do Abun\u00e3, had been blocked from operating since 2021. During the latest inspection, authorities found 613 logs of valuable timber species without demonstrated chain of custody or links to authorised forest management plans, together with 471 m\u00b3 of processed lumber prepared for loading and transport. Twelve timber companies were inspected during the operation, but only this sawmill had its installations and machinery disabled.<\/p>\n<p>For European timber importers, however, the volumes are not the most interesting part of the case. Ibama alleges that the company had repeatedly obtained fraudulent credits in a forest control system, allowing timber of illicit origin to acquire the appearance of legitimate material. That is precisely where the case becomes relevant to EUDR.<\/p>\n<p><strong>Legal-looking timber can still carry origin risk<\/strong><\/p>\n<p>Much of the timber industry's preparation for EUDR has concentrated on obtaining geolocation data, supplier declarations, harvesting documentation and other records required to build a due diligence file.<\/p>\n<p>The Rond\u00f4nia case shows the limitation of treating those records individually.<\/p>\n<p>An official record can establish that a transaction was entered into a control system. It does not necessarily prove that the physical timber associated with that transaction came from the forest area declared for it.<\/p>\n<p>Brazil's forest-control infrastructure records movements and transformations of timber, including inputs, processed products, consumed volumes, output volumes and conversion coefficients at sawmills and other processing facilities. If credits representing timber are introduced fraudulently into such a chain, subsequent transactions can become considerably harder for a downstream buyer to assess simply by looking at the final documentation.<\/p>\n<p>For an EU importer, the commercial problem is straightforward: the documentation may exist while the origin risk remains.<\/p>\n<p><strong>EUDR puts the reliability of the information under scrutiny<\/strong><\/p>\n<p>The EUDR requires operators to collect information including the country of production, geolocation of production plots, suppliers and adequately conclusive and verifiable evidence that products are deforestation-free and produced in accordance with the relevant legislation of the country of production.<\/p>\n<p>But collecting that information is only one part of due diligence.<\/p>\n<p>Article 10 requires operators subject to the full due diligence procedure to verify and analyse the information collected and assess whether there is a risk of non-compliance. The regulation specifically includes the reliability and validity of information, links between different documents, concerns over document or data falsification, supply-chain complexity and difficulties connecting a product with its plot of production among the risk criteria.<\/p>\n<p>This makes the Brazilian case unusually relevant for timber. A European buyer may receive a valid-looking harvesting document, transport information, mill records and coordinates. Under EUDR, the question is not necessarily settled because every required field has been completed. The importer may also need to establish whether those pieces of information can reasonably describe the same physical timber.<\/p>\n<p><strong>Volume reconciliation could become one of the key checks<\/strong><\/p>\n<p>For timber companies, one of the more practical ways of testing a supply chain is likely to be through volumes. Suppose timber is declared as originating from a particular forest management area. The authorised harvesting volume, species composition and harvesting period establish one side of the equation. Mill intake creates another. Processing generates another.<\/p>\n<p>The quantity of lumber eventually offered to an importer should be reasonably compatible with the amount and type of roundwood entering the chain, taking processing yields and other outputs into account. A discrepancy does not automatically establish illegal origin. But a material discrepancy that cannot be satisfactorily explained can become relevant to the risk assessment.<\/p>\n<p>The same logic applies to dates. Harvesting, transport, mill intake, processing and export should form a plausible chronological sequence. This is considerably different from asking suppliers for another certificate.<\/p>\n<p><strong>Enforcement information could matter more to European buyers<\/strong><\/p>\n<p>The latest European Commission guidance reinforces this approach. It says information collected under the EUDR must be assessed as a whole and that operators must be capable of evaluating both the content and reliability of documents and the connections between information contained in different records.<\/p>\n<p>This also increases the value of information produced by authorities in supplier countries.<\/p>\n<p>An importer conducting due diligence on a Brazilian supply chain may have perfectly ordinary documentation in front of it. But information showing enforcement actions, irregular forest credits, previous operating suspensions or problems involving an upstream supplier can materially change the risk picture. That does not make timber from the country, region or even surrounding companies automatically non-compliant. In the Rond\u00f4nia operation itself, Ibama inspected 12 timber businesses and disabled only one. It does mean that supplier screening cannot stop with the documents supplied by the supplier.<\/p>\n<p><strong>Brazil is particularly important because of the complexity of native timber chains<\/strong><\/p>\n<p>Rond\u00f4nia is not a marginal producing region. Ibama data covering native species production in 2012-2020 put Rond\u00f4nia behind Mato Grosso and Par\u00e1 among Brazil's largest producing states; together the three accounted for about 83% of the recorded production covered by the analysis.<\/p>\n<p>Native tropical timber chains can also involve numerous species, harvesting areas, transport movements, intermediaries and processing stages before material reaches an overseas buyer.<\/p>\n<p>For an EU company importing Brazilian hardwood lumber, the EUDR exercise may therefore increasingly resemble a reconciliation of the physical supply chain rather than an administrative checklist.<\/p>\n<p>The importer needs to know where the timber was harvested. But it may also need enough evidence to understand how timber from those plots became the lumber appearing on the invoice.<\/p>\n<p><strong>What European importers should take from the case<\/strong><\/p>\n<p>The lesson from Rond\u00f4nia is not that Brazilian forest documents are unreliable. Nor does an enforcement case involving one company justify treating Brazilian timber as a whole as suspect.<\/p>\n<p>The more useful conclusion is narrower. Where an importer is subject to full EUDR due diligence, official documentation is evidence to be assessed, not an automatic guarantee of origin. The regulation itself directs operators to consider document reliability, possible falsification, supply-chain complexity and the connection between the product and its declared production plot.<\/p>\n<p>For timber buyers, that can mean comparing geolocation and forest-management information with authorised volumes, species, harvesting dates, transport movements, mill intake, processing output and the quantity ultimately sold for export.<\/p>\n<p>Where those elements fit together, they strengthen the case that the declared origin is credible. Where they do not, another document may not solve the problem.<\/p>\n<p>The Rond\u00f4nia case shows why this will be important for European timber companies under EUDR. A supply chain can potentially look complete in an electronic system while the physical timber behind it tells a different story. For importers, the stronger due diligence file will therefore not necessarily be the one containing the most paperwork. It will be the one that can explain, with reasonable consistency, how the timber moved from the declared forest plot to the shipment entering the EU market.<\/p>","protected":false},"excerpt":{"rendered":"<p>A Brazilian enforcement case involving allegedly fraudulent timber credits offers European importers a useful preview of one of the harder questions under EUDR: how to deal with wood that has entered an official traceability system but whose physical origin may &hellip; <a href=\"https:\/\/www.timberindustrynews.com\/ro\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":99735,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[5204],"tags":[],"class_list":["post-99734","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone - Timber Industry News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.timberindustrynews.com\/ro\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone - Timber Industry News\" \/>\n<meta property=\"og:description\" content=\"A Brazilian enforcement case involving allegedly fraudulent timber credits offers European importers a useful preview of one of the harder questions under EUDR: how to deal with wood that has entered an official traceability system but whose physical origin may &hellip; Continue reading &rarr;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.timberindustrynews.com\/ro\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\" \/>\n<meta property=\"og:site_name\" content=\"Timber Industry News\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-27T05:50:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-27T15:39:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"563\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"GWMI Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"GWMI Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\"},\"author\":{\"name\":\"GWMI Admin\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff\"},\"headline\":\"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone\",\"datePublished\":\"2026-08-27T05:50:23+00:00\",\"dateModified\":\"2026-08-27T15:39:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\"},\"wordCount\":1206,\"publisher\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp\",\"articleSection\":[\"Daily News\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\",\"url\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\",\"name\":\"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone - Timber Industry News\",\"isPartOf\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp\",\"datePublished\":\"2026-08-27T05:50:23+00:00\",\"dateModified\":\"2026-08-27T15:39:50+00:00\",\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage\",\"url\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp\",\"contentUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp\",\"width\":1000,\"height\":563,\"caption\":\"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#website\",\"url\":\"https:\/\/www.timberindustrynews.com\/\",\"name\":\"Timber Industry News\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.timberindustrynews.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#organization\",\"name\":\"Timber Industry News\",\"url\":\"https:\/\/www.timberindustrynews.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg\",\"contentUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg\",\"width\":150,\"height\":57,\"caption\":\"Timber Industry News\"},\"image\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff\",\"name\":\"GWMI Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g\",\"caption\":\"GWMI Admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone - Timber Industry News","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.timberindustrynews.com\/ro\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/","og_locale":"ro_RO","og_type":"article","og_title":"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone - Timber Industry News","og_description":"A Brazilian enforcement case involving allegedly fraudulent timber credits offers European importers a useful preview of one of the harder questions under EUDR: how to deal with wood that has entered an official traceability system but whose physical origin may &hellip; Continue reading &rarr;","og_url":"https:\/\/www.timberindustrynews.com\/ro\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/","og_site_name":"Timber Industry News","article_published_time":"2026-08-27T05:50:23+00:00","article_modified_time":"2026-08-27T15:39:50+00:00","og_image":[{"width":1000,"height":563,"url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp","type":"image\/webp"}],"author":"GWMI Admin","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"GWMI Admin","Timp estimat pentru citire":"6 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#article","isPartOf":{"@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/"},"author":{"name":"GWMI Admin","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff"},"headline":"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone","datePublished":"2026-08-27T05:50:23+00:00","dateModified":"2026-08-27T15:39:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/"},"wordCount":1206,"publisher":{"@id":"https:\/\/www.timberindustrynews.com\/#organization"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage"},"thumbnailUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp","articleSection":["Daily News"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/","url":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/","name":"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone - Timber Industry News","isPartOf":{"@id":"https:\/\/www.timberindustrynews.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage"},"thumbnailUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp","datePublished":"2026-08-27T05:50:23+00:00","dateModified":"2026-08-27T15:39:50+00:00","inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone\/#primaryimage","url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp","contentUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/08\/brazil-sawmill-closure-shows-why-eudr-compliance-cannot-rely-on-documents-alone.webp","width":1000,"height":563,"caption":"Brazil sawmill closure shows why EUDR compliance cannot rely on documents alone"},{"@type":"WebSite","@id":"https:\/\/www.timberindustrynews.com\/#website","url":"https:\/\/www.timberindustrynews.com\/","name":"\u0218tiri din industria lemnului","description":"","publisher":{"@id":"https:\/\/www.timberindustrynews.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.timberindustrynews.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/www.timberindustrynews.com\/#organization","name":"\u0218tiri din industria lemnului","url":"https:\/\/www.timberindustrynews.com\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg","contentUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg","width":150,"height":57,"caption":"Timber Industry News"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff","name":"GWMI Admin","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g","caption":"GWMI Admin"}}]}},"_links":{"self":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/99734","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/comments?post=99734"}],"version-history":[{"count":1,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/99734\/revisions"}],"predecessor-version":[{"id":99736,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/99734\/revisions\/99736"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/media\/99735"}],"wp:attachment":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/media?parent=99734"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/categories?post=99734"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/tags?post=99734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}