{"id":81385,"date":"2021-10-26T04:24:55","date_gmt":"2021-10-26T04:24:55","guid":{"rendered":"https:\/\/tin.happy-projects.ro\/supply-chain-issues-open-door-mass-timber-projects-canada\/"},"modified":"2025-09-19T08:56:20","modified_gmt":"2025-09-19T08:56:20","slug":"supply-chain-issues-open-door-mass-timber-projects-canada","status":"publish","type":"post","link":"https:\/\/www.timberindustrynews.com\/ro\/supply-chain-issues-open-door-mass-timber-projects-canada\/","title":{"rendered":"Supply chain issues open door for mass timber projects in Canada"},"content":{"rendered":"<p><em>Current supply chain difficulties that extend lead times on commodities such as steel I-joists and pre-engineered building are creating new opportunities for mass timber products in the construction of lowrise commercial buildings across Canada.<\/em><\/p>\n<p>So says Patrick Crabbe, national director of mass timber with Bird Construction, pointing out mass timber beams and columns can make a leap into the one-storey, 10,000 to 15,000 square foot office-retail building world because they can be manufactured in only eight weeks and installed in another two.<\/p>\n<p>Developers have often used pre-engineered steel designs for the lowrise structures because of budget and construction time familiarity but since the pandemic lead times on materials have thrown a wrinkle into schedules. Pre-engineered buildings can take 32 weeks or longer for delivery, forcing developers to re-evaluate alternatives.<\/p>\n<p>Prior to the pandemic, Bird could deliver a multi-tenant, 10,000-square-foot bricks and mortar project in six to eight months, says Crabbe.<\/p>\n<p>\u201cNow, it takes like 16 months. Over the past eight months it has been steel components that are creating the scheduled delays.\u201d<\/p>\n<p>He says while steel prices are rising, lumber costs have dropped \u201csubstantially\u201d since spring.<\/p>\n<p>\u201cThe reality of the supply chain dynamics is that COVID-19 and the construction increase of large distribution centres (Amazon and Walmart are examples) have created a lack of supply of commodity items like steel I-joists or pre-engineered buildings.\u201d<\/p>\n<p>Crabbe, who oversees everything from pre-construction to execution for all of Bird\u2019s mass timber projects in Canada, says according to the Canadian Wood Council (CWC), lowrise commercial is the largest construction sector in Canada, representing about 40 per cent of non-residential, but it uses the lowest board foot per square foot.<\/p>\n<p>While mass timber might cost a bit more than steel, delays in delivery and lead time of I-joists has brought up the end costs of buildings constructed in steel.<\/p>\n<p>Crabbe expects mass timber to grow in the \u201chybrid industrial office\u201d sector, even when steel supply returns to normal, because \u201cpeople are going to want to be in these higher quality spaces\u201d and the buildings will generate more revenue for owners.<\/p>\n<p>What\u2019s more, mass timber has environmental and carbon sequestration benefits over steel and concrete.<\/p>\n<p>\u201cTo meet the infrastructure pressures of society, this is a solution without the environmental detriment.\u201d<\/p>\n<p>In past years most contractors were unfamiliar with mass timber. Today many are ready to bid because they understand the procurement and delivery, he adds.<\/p>\n<p>While the lowrise commercial sector is sizable, Bird\u2019s mass timber expert is confident in the immediate term Canadian mass timber manufacturers have the production capacity to meet the demand because of recent expansion efforts.<\/p>\n<p>He says the CWC is preparing to publish a lowrise commercial construction guide highlighting cost-effective mass timber solutions.<\/p>\n<p>Bird Construction has a portfolio of 25 mass timber projects worth $1.1 billion.<\/p>","protected":false},"excerpt":{"rendered":"<p>Current supply chain difficulties that extend lead times on commodities such as steel I-joists and pre-engineered building are creating new opportunities for mass timber products in the construction of lowrise commercial buildings across Canada. So says Patrick Crabbe, national director &hellip; <a href=\"https:\/\/www.timberindustrynews.com\/ro\/supply-chain-issues-open-door-mass-timber-projects-canada\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":60192,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[4716,4715],"tags":[3313,4254,4567],"class_list":["post-81385","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-trends","category-market-analysis","tag-canada","tag-mass-timber","tag-supply-chain","topic-wood-construction","topic-wood-based-panels","area-north-america"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Supply chain issues open door for mass timber projects in Canada - Timber Industry News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.timberindustrynews.com\/ro\/supply-chain-issues-open-door-mass-timber-projects-canada\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Supply chain issues open door for mass timber projects in Canada - Timber Industry News\" \/>\n<meta property=\"og:description\" content=\"Current supply chain difficulties that extend lead times on commodities such as steel I-joists and pre-engineered building are creating new opportunities for mass timber products in the construction of lowrise commercial buildings across Canada. So says Patrick Crabbe, national director &hellip; Continue reading &rarr;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.timberindustrynews.com\/ro\/supply-chain-issues-open-door-mass-timber-projects-canada\/\" \/>\n<meta property=\"og:site_name\" content=\"Timber Industry News\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-26T04:24:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-19T08:56:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1040\" \/>\n\t<meta property=\"og:image:height\" content=\"692\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"GWMI Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"GWMI Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/\"},\"author\":{\"name\":\"GWMI Admin\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff\"},\"headline\":\"Supply chain issues open door for mass timber projects in Canada\",\"datePublished\":\"2021-10-26T04:24:55+00:00\",\"dateModified\":\"2025-09-19T08:56:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/\"},\"wordCount\":471,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg\",\"keywords\":[\"Canada\",\"mass timber\",\"supply chain\"],\"articleSection\":[\"Latest Trends\",\"Market Analysis\"],\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/\",\"url\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/\",\"name\":\"Supply chain issues open door for mass timber projects in Canada - Timber Industry News\",\"isPartOf\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg\",\"datePublished\":\"2021-10-26T04:24:55+00:00\",\"dateModified\":\"2025-09-19T08:56:20+00:00\",\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage\",\"url\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg\",\"contentUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg\",\"width\":1040,\"height\":692},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#website\",\"url\":\"https:\/\/www.timberindustrynews.com\/\",\"name\":\"Timber Industry News\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.timberindustrynews.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#organization\",\"name\":\"Timber Industry News\",\"url\":\"https:\/\/www.timberindustrynews.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg\",\"contentUrl\":\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg\",\"width\":150,\"height\":57,\"caption\":\"Timber Industry News\"},\"image\":{\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff\",\"name\":\"GWMI Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g\",\"caption\":\"GWMI Admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Supply chain issues open door for mass timber projects in Canada - Timber Industry News","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.timberindustrynews.com\/ro\/supply-chain-issues-open-door-mass-timber-projects-canada\/","og_locale":"ro_RO","og_type":"article","og_title":"Supply chain issues open door for mass timber projects in Canada - Timber Industry News","og_description":"Current supply chain difficulties that extend lead times on commodities such as steel I-joists and pre-engineered building are creating new opportunities for mass timber products in the construction of lowrise commercial buildings across Canada. So says Patrick Crabbe, national director &hellip; Continue reading &rarr;","og_url":"https:\/\/www.timberindustrynews.com\/ro\/supply-chain-issues-open-door-mass-timber-projects-canada\/","og_site_name":"Timber Industry News","article_published_time":"2021-10-26T04:24:55+00:00","article_modified_time":"2025-09-19T08:56:20+00:00","og_image":[{"width":1040,"height":692,"url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg","type":"image\/jpeg"}],"author":"GWMI Admin","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"GWMI Admin","Timp estimat pentru citire":"2 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#article","isPartOf":{"@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/"},"author":{"name":"GWMI Admin","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff"},"headline":"Supply chain issues open door for mass timber projects in Canada","datePublished":"2021-10-26T04:24:55+00:00","dateModified":"2025-09-19T08:56:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/"},"wordCount":471,"commentCount":0,"publisher":{"@id":"https:\/\/www.timberindustrynews.com\/#organization"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage"},"thumbnailUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg","keywords":["Canada","mass timber","supply chain"],"articleSection":["Latest Trends","Market Analysis"],"inLanguage":"ro-RO","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/","url":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/","name":"Supply chain issues open door for mass timber projects in Canada - Timber Industry News","isPartOf":{"@id":"https:\/\/www.timberindustrynews.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage"},"thumbnailUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg","datePublished":"2021-10-26T04:24:55+00:00","dateModified":"2025-09-19T08:56:20+00:00","inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/supply-chain-issues-open-door-mass-timber-projects-canada\/#primaryimage","url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg","contentUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2025\/09\/CLT_Plant-sets_up-CLT-board-factory-Kauhajoki-Finland-papnews.jpg","width":1040,"height":692},{"@type":"WebSite","@id":"https:\/\/www.timberindustrynews.com\/#website","url":"https:\/\/www.timberindustrynews.com\/","name":"\u0218tiri din industria lemnului","description":"","publisher":{"@id":"https:\/\/www.timberindustrynews.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.timberindustrynews.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/www.timberindustrynews.com\/#organization","name":"\u0218tiri din industria lemnului","url":"https:\/\/www.timberindustrynews.com\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg","contentUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg","width":150,"height":57,"caption":"Timber Industry News"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff","name":"GWMI Admin","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g","caption":"GWMI Admin"}}]}},"_links":{"self":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/81385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/comments?post=81385"}],"version-history":[{"count":0,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/81385\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/media\/60192"}],"wp:attachment":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/media?parent=81385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/categories?post=81385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/tags?post=81385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}