{"id":100648,"date":"2026-11-17T08:05:45","date_gmt":"2026-11-17T08:05:45","guid":{"rendered":"https:\/\/www.timberindustrynews.com\/?p=100648"},"modified":"2026-11-17T22:49:43","modified_gmt":"2026-11-17T22:49:43","slug":"north-american-sawmills-close-as-new-capacity-takes-shape","status":"publish","type":"post","link":"https:\/\/www.timberindustrynews.com\/ro\/north-american-sawmills-close-as-new-capacity-takes-shape\/","title":{"rendered":"North American sawmills close as new capacity takes shape"},"content":{"rendered":"<p>North America\u2019s lumber producers are closing mills while continuing to invest in new production. Weak demand, expensive fibre and financial pressure are forcing some operations out of the market. Elsewhere, companies are building larger mills and improving existing facilities, preparing for a recovery that has yet to provide enough orders for everyone.<!--more--><\/p>\n<p>The contrast is particularly sharp in Arkansas. West Fraser has announced an indefinite curtailment at Leola (for complete data see table below), a sawmill with annual capacity of 225 million board feet. Canfor is investing US$96 million at Iron Mountain, where modernisation and logistics improvements are expected to more than double annual net production to approximately 220 million board feet.<\/p>\n<p>These decisions are compatible. An industry with surplus capacity can still attract investment when companies expect new equipment to produce at a lower cost than competing mills. The result is a more difficult adjustment for older operations: they must survive weak demand today while preparing to compete against more efficient production tomorrow.<\/p>\n<p>In Canada, the latest developments are less encouraging. Saint-Michel has closed permanently in Quebec, Domtar has announced an indefinite stoppage at Outardes, and Conifex\u2019s Mackenzie operation produced no lumber during the third quarter. A fire at Sexton Lumber has added a separate interruption in Newfoundland and Labrador.<\/p>\n<p>Gillfor\u2019s completed acquisition of selected Teal-Jones operations provides a more constructive development. But preserving an existing business through a change of ownership is different from adding new production capacity.<\/p>\n<p><strong>Southern investment continues despite curtailments<\/strong>S<\/p>\n<p>The US South remains a major destination for sawmill investment, although Leola\u2019s planned curtailment shows that location alone does not protect a producer from weak markets. West Fraser attributed its latest production cuts to subdued demand, including difficult conditions in housing and repair and remodelling.<\/p>\n<p>Canfor\u2019s Iron Mountain programme combines manufacturing improvements with better transport infrastructure. The planer phase was completed in the second quarter of 2025. Work on the sawmill and log yard is expected to finish in the fourth quarter of 2026, while a transload facility completed earlier this year serves both Iron Mountain and Urbana.<\/p>\n<p>The programme is expected to create approximately 75 additional jobs at the mill and in logistics. Its commercial purpose extends beyond producing more lumber: handling and shipping improvements should help the company move that output to customers more efficiently.<\/p>\n<p>Other southern investments are already entering production. Interfor reported that the ramp-up of its rebuilt Thomaston mill in Georgia was completed during the third quarter. West Fraser\u2019s replacement mill at Henderson, Texas, is also progressing through its ramp-up.<\/p>\n<p>Their contribution to supply will depend on operating rates and orders. A mill\u2019s rated annual capacity does not become an equivalent volume of shipments immediately after startup, particularly when market conditions discourage full production.<\/p>\n<p>More capacity is approaching. Hampton Lumber\u2019s US$225 million mill at Fairfax, South Carolina, is expected to begin production in early 2027. The company has established a Southern Yellow Pine sales operation ahead of the opening, extending a business historically concentrated in the western United States.<\/p>\n<p>At Macon, Mississippi, Barge Forest Products has announced an US$8.3 million expansion involving additional building space, optimised edging and resaw equipment. Completion is scheduled for October 2027. Although no annual capacity increase has been disclosed, the project will expand the operation\u2019s processing capabilities.<\/p>\n<p>These investments place a premium on execution. Companies need enough orders to spread their capital costs across higher production, but additional output can also prolong pressure on selling prices if consumption remains weak.<\/p>\n<p><strong>Canadian shutdowns become longer and more difficult to reverse<\/strong><\/p>\n<p>Saint-Michel\u2019s permanent closure follows more than a year of interrupted and reduced activity. Approximately 100 unionised workers are affected. Attempts to resume production did not establish a sufficiently durable operating business.<\/p>\n<p>At Domtar\u2019s Outardes sawmill in Quebec, sawing is scheduled to stop indefinitely on 20 November. Difficulties securing harvesting authorisations and predictable wood supply have added to pressure from operating costs and weak lumber markets.<\/p>\n<p>The problem extends beyond finding buyers for finished lumber. A sawmill needs a dependable flow of suitable logs, harvesting contractors able to deliver them and enough working capital to finance the interval between buying timber and receiving payment. Uncertainty at any stage can make continued production uneconomic.<\/p>\n<p>Previously announced reductions remain significant. Interfor indefinitely curtailed Nairn Centre and Gogama in Ontario in the spring. Canfor permanently closed Fox Creek in Alberta, removing 120 million board feet of annual capacity. Carrier\u2019s Big River mill in Saskatchewan entered an indefinite curtailment in October.<\/p>\n<p>The geographic spread is important. British Columbia continues to face severe pressure, but closures and extended stoppages now affect substantial operations across several Canadian provinces.<\/p>\n<p>At Mackenzie, the initial expectation of a short interruption has given way to a much longer shutdown. Conifex recorded no lumber production during the third quarter, and its planer was also idle.<\/p>\n<p>The company\u2019s proposed restart around December depends on financing and log availability. Conifex warned that, without the remaining C$10.2 million under its federal tariff-related loan facility, available cash would not support operations beyond December. Its power plant resumed operations on 10 November, but that did not constitute a restart of lumber production.<\/p>\n<p>Western Forest Products is keeping Chemainus and Cowichan Bay curtailed through the remainder of 2026. At the same time, it continues to invest in selected drying, thermal-modification and grading operations. Capital is being directed towards particular facilities and products while other parts of the manufacturing base remain idle.<\/p>\n<p><strong>Acquisitions preserve businesses, but do not automatically restore output<\/strong><\/p>\n<p>Gillfor completed its acquisition of Teal-Jones\u2019 Surrey, Sumas and TFL 46 operations on 30 October, following court approval in September. The operations retain the Teal-Jones name under new management.<\/p>\n<p>The transaction brings together established sawmilling, further processing, distribution and forest access. Its immediate significance is continuity under new ownership. No additional annual capacity was announced with completion of the acquisition.<\/p>\n<p>For distressed mills, a new owner can provide financing, commercial relationships and a different operating structure. Whether that translates into higher production still depends on fibre supply, manufacturing costs and demand.<\/p>\n<p>In Virginia, Twain Lumber plans to invest US$7.4 million to reopen a former Teal-Jones sawmill in Henry County. The project targets annual capacity of 108 million board feet, compared with 80 million previously.<\/p>\n<p>That represents two separate changes: the restoration of idle capacity and a planned increase of approximately 28 million board feet. Treating all 108 million as new capacity would overstate the physical expansion.<\/p>\n<p>There are also investments in existing Canadian operations. Interfor\u2019s Elk Lake mill in Ontario is receiving C$9.6 million in government support for a biomass energy system. The project is expected to increase production by 27% and reduce natural-gas consumption by 80%.<\/p>\n<p>The funding award is not necessarily the total project cost. Nevertheless, the investment offers a route to improving competitiveness through lower energy requirements and better use of existing manufacturing assets.<\/p>\n<p><strong>Investment extends beyond the southern states<\/strong><\/p>\n<p>Irving Forest Products plans to expand its Ashland sawmill in Maine from 130 million to 250 million board feet annually. The additional 120 million board feet would substantially increase the operation\u2019s scale.<\/p>\n<p>In Oregon, Sierra Pacific Industries\u2019 replacement complex at Eugene targets annual capacity of 650 million board feet. The project replaces existing manufacturing facilities, so the full figure should not be counted as an equivalent net addition. Public project documentation places completion by the end of 2028.<\/p>\n<p>These longer-term projects will influence the industry well beyond the current round of closures. Their owners are committing capital on the expectation that efficient domestic production will remain competitive across several market cycles.<\/p>\n<p>Smaller changes also accumulate. Mill rebuilds, second-shift additions, kiln investments and reopened facilities can increase available supply without the announcement of a large greenfield project. Conversely, a second shift can be removed more readily than a newly constructed mill can be closed.<\/p>\n<p>For this reason, tracking utilisation alongside installed capacity is essential. The machinery available to produce lumber and the volume that companies are willing or able to manufacture can move in different directions.<\/p>\n<p><strong>Fire disruptions add another source of lost production<\/strong><\/p>\n<p>Sexton Lumber\u2019s Bloomfield mill stopped following a fire on 29 October. The Newfoundland and Labrador operation has reported annual capacity of approximately 65 million board feet. Harvesting and log purchasing were also interrupted, spreading the disruption to suppliers and contractors.<\/p>\n<p>Subsequent reporting described approximately 100 temporary layoffs and management\u2019s hope that repairs could be completed within weeks. That remains a recovery objective rather than confirmation that production has resumed.<\/p>\n<p>Sexton should therefore be treated as temporarily interrupted capacity, with the duration dependent on repairs. It does not belong in the same category as a confirmed permanent closure.<\/p>\n<p>Earlier fire-related shutdowns also require updating. Robbins Lumber reports that full mill operations at Searsmont, Maine, resumed on 26 May. Retaining the mill on a current closure list would exaggerate the loss of available supply.<\/p>\n<p>Western Forest Products\u2019 Columbia Vista operation in Washington followed a different course. The company sold the fire-damaged sawmill site assets in July, without announcing a production restart.<\/p>\n<p><strong>Recovery will favour a different production base<\/strong><\/p>\n<p>The announcements do not provide a simple measure of whether North American capacity is rising or falling. Replacement mills, expansions, restored shifts, acquisitions and temporary stoppages describe different changes. Their effects also arrive at different times.<\/p>\n<p>What is becoming clearer is the competitive position of the mills that remain. Companies completing modernisation projects will seek higher operating rates to earn a return on their investment. Producers facing expensive logs, uncertain fibre access or limited cash reserves may find it difficult to restart even when lumber prices improve.<\/p>\n<p>Long curtailments create additional problems. Employees find other work, contractors lose business and maintenance continues to absorb cash. The longer an operation remains idle, the more demanding a restart can become.<\/p>\n<p>New southern mills and selected expansions elsewhere are approaching commercial production while Canadian stoppages are becoming longer and, in some cases, permanent. Stronger lumber consumption would improve the industry\u2019s finances. It would not necessarily bring the same mills back.<\/p>\n<div style=\"width: 100%; margin: 24px 0; background: #ffffff; color: #202020; font-family: Arial,Helvetica,sans-serif;\">\n<div style=\"width: 44px; height: 4px; background: #c32026; margin-bottom: 12px;\"><\/div>\n<div style=\"font-size: 18px; font-weight: bold; line-height: 1.3; margin-bottom: 6px;\">North American sawmill investments<\/div>\n<div style=\"font-size: 12px; line-height: 1.5; color: #666666; margin-bottom: 15px;\">Selected expansions, restarts and acquisitions \u00b7 Status at 17 November 2026<\/div>\n<div style=\"width: 100%; overflow-x: auto;\">\n<table style=\"width: 100%; min-width: 660px; border-collapse: collapse; table-layout: auto; font-size: 13px; line-height: 1.5; border: 1px solid #cccccc;\">\n<thead>\n<tr style=\"background: #eeeeeb;\">\n<th style=\"width: 23%; padding: 11px 12px; border: 1px solid #cccccc; text-align: left; vertical-align: top; font-size: 12px; color: #222222;\">Company \/ location<\/th>\n<th style=\"width: 29%; padding: 11px 12px; border: 1px solid #cccccc; text-align: left; vertical-align: top; font-size: 12px; color: #222222;\">Investment \/ project<\/th>\n<th style=\"width: 48%; padding: 11px 12px; border: 1px solid #cccccc; text-align: left; vertical-align: top; font-size: 12px; color: #222222;\">Capacity and status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Canfor \u2014 Iron Mountain<\/strong><br \/>\n<span style=\"color: #666666;\">Arkansas<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">US$96m modernisation and logistics programme.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Annual net production targeted at <strong>220 MMbf<\/strong>, more than double the previous level. Sawmill and log-yard phase expected in Q4 2026.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Interfor \u2014 Thomaston<\/strong><br \/>\n<span style=\"color: #666666;\">Georgia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Rebuilt sawmill.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Reported capacity of <strong>240 MMbf<\/strong>. Ramp-up completed in Q3 2026.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>West Fraser \u2014 Henderson<\/strong><br \/>\n<span style=\"color: #666666;\">Texas<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Replacement sawmill.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>275 MMbf<\/strong> rated capacity. Startup completed in late 2025; ramp-up continues. Full capacity is not entirely incremental.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Hampton Lumber \u2014 Fairfax<\/strong><br \/>\n<span style=\"color: #666666;\">South Carolina<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">US$225m new sawmill.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Production expected in <strong>early 2027<\/strong>. Annual capacity not specified in the state investment announcement.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Barge Forest Products \u2014 Macon<\/strong><br \/>\n<span style=\"color: #666666;\">Mississippi<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">US$8.3m processing expansion.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Additional building, edging and resaw equipment. Completion scheduled for <strong>October 2027<\/strong>; capacity increase not quantified.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Twain Lumber \u2014 Henry County<\/strong><br \/>\n<span style=\"color: #666666;\">Virginia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">US$7.4m acquisition and reopening project.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Target of <strong>108 MMbf<\/strong>, versus 80 MMbf previously. Restores idle capacity and adds a planned <strong>28 MMbf<\/strong>.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Irving Forest Products \u2014 Ashland<\/strong><br \/>\n<span style=\"color: #666666;\">Maine<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Major sawmill expansion.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Capacity planned to rise from <strong>130 to 250 MMbf<\/strong>, an increase of 120 MMbf. Expansion announced in September 2026.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Sierra Pacific Industries \u2014 Eugene<\/strong><br \/>\n<span style=\"color: #666666;\">Oregon<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Replacement complex; approximately US$253m in public project documentation.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Target of <strong>650 MMbf<\/strong>, replacing existing facilities. Public project documentation places completion by <strong>end-2028<\/strong>.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Jasper Lumber \u2014 Jasper<\/strong><br \/>\n<span style=\"color: #666666;\">Alabama<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">US$135m modernisation programme.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Capacity targeted to increase from <strong>65 to approximately 225 MMbf<\/strong>. Programme extends into 2026.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Southeastern Timber Products \u2014 Ackerman<\/strong><br \/>\n<span style=\"color: #666666;\">Mississippi<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Multi-year expansion reported at more than US$200m.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Target capacity of approximately <strong>300 MMbf<\/strong>. Published investment figures cover different phases and should not be added together.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Interfor \u2014 Elk Lake<\/strong><br \/>\n<span style=\"color: #666666;\">Ontario<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">C$9.6m government support for a biomass energy system.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Expected production increase of <strong>27%<\/strong> and natural-gas reduction of 80%. Funding award is not stated total project cost.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Gillfor \u2014 Teal-Jones operations<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Acquisition completed on 30 October 2026; price not disclosed.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Surrey, Sumas and TFL 46 operations under new management. <strong>No new capacity announced.<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Western Forest Products<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Drying, thermal-modification and grading investments.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Continuous kiln commissioned in June and thermal kiln in July. Further grading investment planned; primary sawing capacity increase not quantified.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Rex Lumber \u2014 Brookhaven<\/strong><br \/>\n<span style=\"color: #666666;\">Mississippi<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Mill rebuild and expansion.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Reported capacity increase of approximately <strong>25 MMbf<\/strong> in the 2026 investment programme.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Harrigan Lumber \u2014 Monroeville<\/strong><br \/>\n<span style=\"color: #666666;\">Alabama<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Second-shift restart.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Restores operating output following the earlier shift reduction. No new installed capacity figure reported.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Pine Plantation Products \u2014 Metcalfe<\/strong><br \/>\n<span style=\"color: #666666;\">Georgia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Restart of former Hood operation.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Restart reported in 2026. Incremental capacity not verified.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Doman \u2014 Estill<\/strong><br \/>\n<span style=\"color: #666666;\">South Carolina<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Mill startup.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Startup reported in 2026. Shipment contribution depends on the operating ramp-up.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Interfor \u2014 Grand Forks<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Second-shift addition.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Higher operating utilisation. No new installed capacity figure reported.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Patrick Lumber \u2014 Philomath<\/strong><br \/>\n<span style=\"color: #666666;\">Oregon<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Kilns and processing expansion.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Adds drying and processing capability; not directly equivalent to primary sawing capacity.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div style=\"font-size: 11px; line-height: 1.6; color: #666666; margin-top: 10px;\">MMbf = million board feet per year. US$ = US dollars; C$ = Canadian dollars. Rated capacity, incremental capacity and restored production are different measures. Announced projects are not necessarily fully operational.<\/div>\n<div style=\"font-size: 11px; line-height: 1.5; color: #666666; margin-top: 6px; border-top: 1px solid #cccccc; padding-top: 8px;\"><strong style=\"color: #333333;\">GWMI<\/strong><\/div>\n<\/div>\n<div style=\"width: 100%; margin: 24px 0; background: #ffffff; color: #202020; font-family: Arial,Helvetica,sans-serif;\">\n<div style=\"font-size: 18px; font-weight: bold; line-height: 1.3; margin-bottom: 6px;\">North American sawmill closures and curtailments<\/div>\n<div style=\"font-size: 12px; line-height: 1.5; color: #666666; margin-bottom: 15px;\">Selected shutdowns, production cuts and fire disruptions \u00b7 Status at 17 November 2026<\/div>\n<div style=\"width: 100%; overflow-x: auto;\">\n<table style=\"width: 100%; min-width: 660px; border-collapse: collapse; table-layout: auto; font-size: 13px; line-height: 1.5; border: 1px solid #cccccc;\">\n<thead>\n<tr style=\"background: #eeeeeb;\">\n<th style=\"width: 25%; padding: 11px 12px; border: 1px solid #cccccc; text-align: left; vertical-align: top; font-size: 12px; color: #222222;\">Company \/ location<\/th>\n<th style=\"width: 27%; padding: 11px 12px; border: 1px solid #cccccc; text-align: left; vertical-align: top; font-size: 12px; color: #222222;\">Status<\/th>\n<th style=\"width: 48%; padding: 11px 12px; border: 1px solid #cccccc; text-align: left; vertical-align: top; font-size: 12px; color: #222222;\">Capacity and operational effect<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>West Fraser \u2014 Leola<\/strong><br \/>\n<span style=\"color: #666666;\">Arkansas<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Indefinite curtailment<\/strong><br \/>\nAnnounced for Q4 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>225 MMbf<\/strong> rated capacity. Orderly wind-down announced; not equivalent to a full year of lost output.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Scierie Saint-Michel<\/strong><br \/>\n<span style=\"color: #666666;\">Quebec<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Permanent closure<\/strong><br \/>\nConfirmed in November 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately <strong>100 unionised workers<\/strong> affected. Annual capacity not verified.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Domtar \u2014 Outardes<\/strong><br \/>\n<span style=\"color: #666666;\">Quebec<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Indefinite stoppage announced<\/strong><br \/>\nScheduled for 20 November 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Sawing scheduled to stop after the review date. Annual capacity not verified.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Sexton Lumber \u2014 Bloomfield<\/strong><br \/>\n<span style=\"color: #666666;\">Newfoundland and Labrador<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Fire-related stoppage<\/strong><br \/>\nFrom 29 October 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately <strong>65 MMbf<\/strong> rated capacity and around 100 temporary layoffs. Restart depends on repairs; not a confirmed permanent closure.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Conifex \u2014 Mackenzie<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Extended curtailment<\/strong><br \/>\nNo lumber production in Q3 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately <strong>240 MMbf<\/strong> rated capacity. December restart objective depends on financing and log availability.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Western Forest Products \u2014 Chemainus<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Extended curtailment<\/strong><br \/>\nThrough end-2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Continued production stoppage. Not classified as a permanent closure.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Western Forest Products \u2014 Cowichan Bay<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Extended curtailment<\/strong><br \/>\nThrough end-2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately <strong>170 MMbf<\/strong> rated capacity remains curtailed.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Canfor \u2014 Fox Creek<\/strong><br \/>\n<span style=\"color: #666666;\">Alberta<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Permanent closure<\/strong><br \/>\n2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>120 MMbf<\/strong> annual capacity removed.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Carrier \u2014 Big River<\/strong><br \/>\n<span style=\"color: #666666;\">Saskatchewan<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Indefinite curtailment<\/strong><br \/>\nFrom 16 October 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately <strong>250 MMbf<\/strong> rated capacity. Limited residual activities may continue after sawing stops.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Interfor \u2014 Nairn Centre<\/strong><br \/>\n<span style=\"color: #666666;\">Ontario<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Indefinite curtailment<\/strong><br \/>\nAnnounced in spring 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately <strong>150 MMbf<\/strong> annual capacity affected.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Interfor \u2014 Gogama<\/strong><br \/>\n<span style=\"color: #666666;\">Ontario<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Indefinite curtailment<\/strong><br \/>\nAnnounced in spring 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately <strong>135 MMbf<\/strong> annual capacity affected.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Brink Forest Products \u2014 Prince George<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Production reduction<\/strong><br \/>\nAnnounced in September 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Finger-joint operation reduced to approximately <strong>20% of capacity<\/strong>, with around 50 layoffs. Secondary processing, not primary sawing.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Valemount Specialty Sawmill<\/strong><br \/>\n<span style=\"color: #666666;\">British Columbia<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Temporary stoppage<\/strong><br \/>\nOctober 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Approximately two-month interruption reported. Return depends on winter access to timber.<\/td>\n<\/tr>\n<tr style=\"background: #f7f7f5;\">\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Marks Lumber \u2014 Clancy<\/strong><br \/>\n<span style=\"color: #666666;\">Montana<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Wind-down announced<\/strong><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">Sawing scheduled to end on 6 November, with inventory sales continuing into 2027. Completion of the sawing shutdown not independently confirmed.<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Western Forest Products \u2014 Columbia Vista<\/strong><br \/>\n<span style=\"color: #666666;\">Washington<\/span><\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\"><strong>Fire-damaged site assets sold<\/strong><br \/>\nJuly 2026.<\/td>\n<td style=\"padding: 11px 12px; border: 1px solid #cccccc; vertical-align: top;\">No production restart announced. Sale replaces the earlier status of a site awaiting a buyer.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div style=\"font-size: 11px; line-height: 1.6; color: #666666; margin-top: 10px;\">MMbf = million board feet per year. Rated capacity is not actual production lost during 2026. Indefinite curtailments, permanent closures and fire disruptions are shown separately and should not be combined into a permanent-capacity-loss total.<\/div>\n<div style=\"font-size: 11px; line-height: 1.6; color: #666666; margin-top: 6px;\">Update: Robbins Lumber\u2019s Searsmont operation resumed full mill operations on 26 May and is excluded from the current shutdown list.<\/div>\n<div style=\"font-size: 11px; line-height: 1.5; color: #666666; margin-top: 6px; border-top: 1px solid #cccccc; padding-top: 8px;\"><strong style=\"color: #333333;\">GWMI<\/strong><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>North America\u2019s lumber producers are closing mills while continuing to invest in new production. Weak demand, expensive fibre and financial pressure are forcing some operations out of the market. Elsewhere, companies are building larger mills and improving existing facilities, preparing &hellip; <a href=\"https:\/\/www.timberindustrynews.com\/ro\/north-american-sawmills-close-as-new-capacity-takes-shape\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>","protected":false},"author":1,"featured_media":100649,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"Default","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[5204],"tags":[],"class_list":["post-100648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>North American sawmills close as new capacity takes shape - Timber Industry News<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.timberindustrynews.com\/ro\/north-american-sawmills-close-as-new-capacity-takes-shape\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"North American sawmills close as new capacity takes shape - Timber Industry News\" \/>\n<meta property=\"og:description\" content=\"North America\u2019s lumber producers are closing mills while continuing to invest in new production. Weak demand, expensive fibre and financial pressure are forcing some operations out of the market. Elsewhere, companies are building larger mills and improving existing facilities, preparing &hellip; Continue reading &rarr;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.timberindustrynews.com\/ro\/north-american-sawmills-close-as-new-capacity-takes-shape\/\" \/>\n<meta property=\"og:site_name\" content=\"Timber Industry News\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-17T08:05:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-17T22:49:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/11\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"900\" \/>\n\t<meta property=\"og:image:height\" content=\"270\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"GWMI Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"GWMI Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/\"},\"author\":{\"name\":\"GWMI Admin\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#\\\/schema\\\/person\\\/135a1ae8119d1d1755135add5b7287ff\"},\"headline\":\"North American sawmills close as new capacity takes shape\",\"datePublished\":\"2026-11-17T08:05:45+00:00\",\"dateModified\":\"2026-11-17T22:49:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/\"},\"wordCount\":2503,\"publisher\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.timberindustrynews.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg\",\"articleSection\":[\"Daily News\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/\",\"url\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/\",\"name\":\"North American sawmills close as new capacity takes shape - Timber Industry News\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.timberindustrynews.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg\",\"datePublished\":\"2026-11-17T08:05:45+00:00\",\"dateModified\":\"2026-11-17T22:49:43+00:00\",\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/north-american-sawmills-close-as-new-capacity-takes-shape\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.timberindustrynews.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg\",\"contentUrl\":\"https:\\\/\\\/www.timberindustrynews.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg\",\"width\":900,\"height\":270,\"caption\":\"North American sawmills close as new capacity takes shape\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#website\",\"url\":\"https:\\\/\\\/www.timberindustrynews.com\\\/\",\"name\":\"Timber Industry News\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.timberindustrynews.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#organization\",\"name\":\"Timber Industry News\",\"url\":\"https:\\\/\\\/www.timberindustrynews.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.timberindustrynews.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/logo_color.svg\",\"contentUrl\":\"https:\\\/\\\/www.timberindustrynews.com\\\/wp-content\\\/uploads\\\/2022\\\/06\\\/logo_color.svg\",\"width\":150,\"height\":57,\"caption\":\"Timber Industry News\"},\"image\":{\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.timberindustrynews.com\\\/#\\\/schema\\\/person\\\/135a1ae8119d1d1755135add5b7287ff\",\"name\":\"GWMI Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g\",\"caption\":\"GWMI Admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"North American sawmills close as new capacity takes shape - Timber Industry News","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.timberindustrynews.com\/ro\/north-american-sawmills-close-as-new-capacity-takes-shape\/","og_locale":"ro_RO","og_type":"article","og_title":"North American sawmills close as new capacity takes shape - Timber Industry News","og_description":"North America\u2019s lumber producers are closing mills while continuing to invest in new production. Weak demand, expensive fibre and financial pressure are forcing some operations out of the market. Elsewhere, companies are building larger mills and improving existing facilities, preparing &hellip; Continue reading &rarr;","og_url":"https:\/\/www.timberindustrynews.com\/ro\/north-american-sawmills-close-as-new-capacity-takes-shape\/","og_site_name":"Timber Industry News","article_published_time":"2026-11-17T08:05:45+00:00","article_modified_time":"2026-11-17T22:49:43+00:00","og_image":[{"width":900,"height":270,"url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/11\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg","type":"image\/jpeg"}],"author":"GWMI Admin","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"GWMI Admin","Timp estimat pentru citire":"12 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/#article","isPartOf":{"@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/"},"author":{"name":"GWMI Admin","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff"},"headline":"North American sawmills close as new capacity takes shape","datePublished":"2026-11-17T08:05:45+00:00","dateModified":"2026-11-17T22:49:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/"},"wordCount":2503,"publisher":{"@id":"https:\/\/www.timberindustrynews.com\/#organization"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/#primaryimage"},"thumbnailUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/11\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg","articleSection":["Daily News"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/","url":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/","name":"North American sawmills close as new capacity takes shape - Timber Industry News","isPartOf":{"@id":"https:\/\/www.timberindustrynews.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/#primaryimage"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/#primaryimage"},"thumbnailUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/11\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg","datePublished":"2026-11-17T08:05:45+00:00","dateModified":"2026-11-17T22:49:43+00:00","inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/north-american-sawmills-close-as-new-capacity-takes-shape\/#primaryimage","url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/11\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg","contentUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2026\/11\/north-american-sawmills-close-as-new-capacity-takes-shape.jpg","width":900,"height":270,"caption":"North American sawmills close as new capacity takes shape"},{"@type":"WebSite","@id":"https:\/\/www.timberindustrynews.com\/#website","url":"https:\/\/www.timberindustrynews.com\/","name":"\u0218tiri din industria lemnului","description":"","publisher":{"@id":"https:\/\/www.timberindustrynews.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.timberindustrynews.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/www.timberindustrynews.com\/#organization","name":"\u0218tiri din industria lemnului","url":"https:\/\/www.timberindustrynews.com\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg","contentUrl":"https:\/\/www.timberindustrynews.com\/wp-content\/uploads\/2022\/06\/logo_color.svg","width":150,"height":57,"caption":"Timber Industry News"},"image":{"@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.timberindustrynews.com\/#\/schema\/person\/135a1ae8119d1d1755135add5b7287ff","name":"GWMI Admin","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7e3f366983e368f37c12ad29c07423641931b311f2561bc3cb4b4eaf6f44c3cb?s=96&d=mm&r=g","caption":"GWMI Admin"}}]}},"_links":{"self":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/100648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/comments?post=100648"}],"version-history":[{"count":1,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/100648\/revisions"}],"predecessor-version":[{"id":100650,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/posts\/100648\/revisions\/100650"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/media\/100649"}],"wp:attachment":[{"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/media?parent=100648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/categories?post=100648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.timberindustrynews.com\/ro\/wp-json\/wp\/v2\/tags?post=100648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}